Job Description Summary
As a member of Global Engineering Centre you will be responsible for coordinating substation design engineering and project engineering management of complex HV/EHV substation projects. Responsibilities include engineering; ownership of scope, schedule & budget; interface coordination with regions, vendor and contractor coordination & construction support needed to execute EHV Substations
The current role is expected to deliver on EHV/HV Designs of grid substation with specific
competency on ACS project integration for HVDC/FACTS projects. Also to deliver ITO/OTR for AC Grid projects. Strong fundamental competency on projects on EHV/HV Designs of Grid substation (AIS & GIS) is pre-requisite.
Job Description
Role & responsibilities:
Execute & analysis, design, test, or integration required to define and support systems that meet business standards and program / product requirements
Prepare and present technical data to internal and external customers
Document and communicate results of technical data generated
Participate on teams assigned to address specific organizational initiatives
Share engineering information and promote open dialogue
Prepare invention disclosures to protect the technology that provides a generous advantage to the business
Assure proper documentation of technical data generated for the assigned projects and/or tasks consistent with engineering policies and procedures
Specific Role Requirements: -
HV (Primary) designs for 132 kV and above GIS/AIS Substation Engineering for Grid Interconnected Renewable Energy Projects
Preparation of basic Single Line Diagram, Layout Plan & Section of Overall plant, Equipment control room building, Earthing Layout, DSLP Layout, Trench Layout etc
Earthing design, Lightning design, Cable Sizing, Illumination system design, Sag Tension calculation, Short Circuit Force and Bus- bar Sizing as per IEEE/IEC.
Calculation of Load, Battery sizing etc.
Preparation of all Distribution/Auxiliary system.
Evaluation of vendor Drawings, GTP, Calculation & Technical Specs
LV/MV Engineering for the collector substation, unit substation & pooling station
ITO (tender) drawings, BOQ estimation, RFQ finalization & evaluation of various components, selection of equipment with best pricing options.
Co-ordination and integration with Automation, Civil & MEP.
Co-ordination of site & office team for execution of project
Flexible and quick to learn global developments in renewable technologies and adopt.
Knowhow of IEEE / IEC codes, safety in design/EHS aspects, AC substation industry engineering practices.
Good Communication skills & capability to spearhead project independently along with Client handling.
Team handling & development.
Specialized Competency (Optional)
Specialized tools like CANECO, ETAP, Dialux, CDGES or equivalent tools
HVDC/FACTS integrated project applications.
Working experience with 3D Design Tools.
Qualifications / Requirements
Strong oral and written communication skills.
Strong interpersonal, responsive and leadership skills.
Ability to work solo. Strong problem-solving skills.
Ability to guide/support team and execute project in line with client/project requirement.
Ability to expand the competency domain, being able to take new learning challenges.
Additional Information
Relocation Assistance Provided: Yes